Motorpoint, Castleford

Project: Motorpoint, Castleford

Date: January 2016

Value: £80000.00

Duration: 10 Weeks

 

Cool Logic were appointed by the main contractor to carry out the design, installation and commissioning of the air conditioning, ventilation and hot & cold water systems to the Sales and workshop buildings at the brand new Motorpoint site in Castleford, West Yorkshire which opens its doors in early April 2016.​

 

A total of 13no. Toshiba split split heat pump air conditioning systems were installed in all sales and office areas within the new buildings. In addition, a heat recovery ventilation systems is installed to provide fresh and extract air within all occupied areas of the sales building in. Additional extract ventilation systems have been installed in other zones (toilets, workshop bays etc.).

 

We have also carried out the full mechanical and plumbing installation to both sales and workshop buildings. This installation included all hot and cold water services to w.c. areas, staff rooms, workshops and external valet area.

 

As part of a client requirement, each air conditioning system installed was designed & selected to be eligible for the Governments Enhanced Capital Allowance (ECA) scheme. The scheme allows the equipment owners to benefit from favourable tax incentives for the installation of energy efficient equipment.

Cool Logic Air Conditioning

Suite 4, Sinclair Court
Darrell Street

Newcastle upon Tyne

NE13 7DS

Phone: 0191 4473348 0191 4473348
Fax:
E-mail: office@clac.uk.com

Print Print | Sitemap
Copyright Cool Logic Air Conditioning and Refrigeration Ltd. 2016

Call

E-mail